Cenergy Power, a commercial solar developer, has completed two solar photovoltaic systems: a 1.12 MW carport/ground-mounted system and a 560.28 kW ground-mounted solar system for Setton Pistachio at its 300,000 square-foot pistachio processing facility in Terra Bella, Calif.
The newly constructed combined installation is expected to produce over 2.6 GWh of energy annually. As part of the arrangement, in addition to the design, engineering and installation, Cenergy Power will be providing 10 years of scheduled operations and maintenance for the system.