juwi solar Inc. (JSI) has inaugurated the Mill Creek Solar Farm, a 3.8 MW photovoltaic energy facility located in Burlington Township, N.J., as part of Public Service Electric and Gas Co.'s (PSE&G) Solar 4 All program.
PSE&G owns the facility, including the rights to all of the electricity generated and 100% of the solar renewable energy credits associated with the system. PSE&G selected JSI through a competitive bid process to perform all of the design, engineering, procurement and construction services associated with the project.
The 25-acre solar facility is ground-mounted and consists of 29,400 fixed-tilt thin-film photovoltaic modules supplied by Solar Frontier.