Southern California Edison (SCE) has signed two contracts with Solar Millennium for a potential 726 MW of power from solar-thermal trough generators. When complete, those projects call for two 242 MW facilities, with the option to expand one to include an additional 242 MW.
The projects would be located in Blythe, Calif., and Ridgecrest, Calif., and are expected to come on line in 2013 and 2014.
SOURCE: Southern California Edison