Solectria Renewables LLC says its inverters have been selected for a 1.43 MW ground-mount solar array at the U.S. Army's Fort Carson installation in Colorado.
Infinity Construction Services Inc. and Intermountain Electric Inc. are providing engineering, procurement and construction services for the project, which is expected to generate nearly 2.2 GWh of electricity annually. Solectria says its Megawatt Solar Station, with two SGI 500XT central inverters, was selected.